2020 new design Chinese high air pressure wind blade glass washing machine
* Cleaning and drying flat glass and Low-e glass
* Conveying roll shafts are all rubber shafts, gear transmission, stepless speed regulator electric motor drive, speed adjustment 0.8~15m/min
* There are three pairs (6pcs) of rotary brushes (up and down) Φ150mm, the whole disc brush can be up and down to adjust the different thickness glass. It can go up for people to maintain. Height adjustable (0-250mm)
* There are three pairs (6pcs) high-pressure air blades to dry the glass, the fan power is 22kw which put into a sound insulation box. Special design of the wind system produces hot air circulation, dry glass with hot air.
* Using water pump as circulation pump, with 2 sets of stainless steel water tanks, which can be pulled out to clean.
* All sparge pipes are stainless steel water pipes
* Independent control cabinet, electric control component are "Schneider" and "Chint" brand. Electric motor control circuit has overloading, default phase, short-circuit protection function to guarantee safe running of the machine
* Machine is with CE Certificate
* Machine size can be customized
Machine type:
Type |
YD-HWB-2500 |
Max.glass width (mm) |
2440 |
Min.glass size (mm) |
500x500 |
Thickness (mm) |
3-25 |
Speed(m/min) |
0.8-15 |
Power(kw) |
50 |
Weight(kg) |
5000 |
* Max glass size 2440mm, min glass size: 500x500mm, thickness 3-25mm
* Transport speed: 0.8-15m/min (adjustable)
* Total power: 50Kw
* Outer dimension: 7*4*2.4m
Warranty and service:
- 1 year warranty for the machine
- Life time service available for parts and malfunctions
- 24 hour on line service
- Working video and installation video avaible
- Provide English operation manual
Payment term and shipping:
- By T/T, 30% deposit, balance paid before delivery
- Machine delivery after 30 days production.
- Machine loading in container or sending by LCL cargo is permit
- Shipping agent will be offer if you required
Machine in workshop:
FAQ
Q: Are you manufactory or trade company?
A:We are manufacturer located in Foshan City Guangdong province.
Q: How long is the production lead time?
A: Production lead time 40-45 days.
Q: What's the MOQ of the products?
A: 1 set.
Q: Which kind of certificate would you have?
A: European Union CE SGS
Q: How long of machine guarantee?
A: 1 year
Contact us: Kelly Feng